Skip to content

Data centres

Power distribution solutions for data centres. Tested, ready-to-use packages that can be put into operation without delays and scaled as capacity grows.

Ask a specialist
Submit a contact request

Power distribution that works right from commissioning

In data centres, power distribution must work without interruptions from the very first connection. Every delay postpones bringing capacity into use and directly affects the launch of services.

At commissioning, things are no longer a matter of design. If the system doesn’t work as expected, the situation has to be fixed on site, which immediately delays the project.

We deliver power distribution solutions to data centres as complete packages that have been tested and integrated before delivery. This way commissioning proceeds as planned and the system works from the very first connection.

In data centres, capacity is increased in stages. The same solution also supports changes and expansions during operation without downtime or modifications to the existing system.

All products

Designed for capacity and growth

Tested before delivery thumbnail

Tested before delivery

Solutions are tested as complete packages before delivery, so functionality, connections and documentation are ready for commissioning. FAT testing ensures the system works before the site phase.

Fast lead times and high factory quality thumbnail

Fast lead times and high factory quality

eHOUSE and ePOD solutions are delivered as factory-built complete units in which power distribution has been built and tested ready. This speeds up project lead times and ensures consistent factory quality. At the same time, our strong integrator expertise makes it possible to deliver the whole together with several partners and technology suppliers.

Scalable structure without downtime thumbnail

Scalable structure without downtime

The modular structure of the POK Potentia® cubicle switchgear system makes it possible to grow capacity in stages without downtime or having to rebuild the system. Capacity can be added without interrupting the existing feed or distribution.

How we ensure continuous operation

In data centre projects, every stage affects the end result. That’s why we focus specifically on ensuring functionality before commissioning.

1

Needs assessment and quotation

We get involved in the project at an early stage and define the electrical infrastructure together with the customer. This ensures correct sizing and future expandability. At this stage we also define the capacity growth path so the system supports future expansion without changes to the structure or downtime in later phases.

2

Design

We design a solution in which all components work together and meet the requirements. Testing and documentation ensure quality before delivery. This ensures that the whole works both in normal operation and in fault situations without interruptions or uncertainty during commissioning.

3

Implementation

We manufacture and test the solutions at our factory so that the system works from the very first connection. During commissioning there is no need for corrections or integrating the system on site.

How can we help?

Tell us about your data centre project. We’ll help you design a power distribution solution that works right at commissioning and makes it possible to grow capacity without interruptions.

Ville Malinen thumbnail

Business Manager

Ville Malinen

Mika Happonen thumbnail

Key Account Manager

Mika Happonen

Matti Saukko thumbnail

Key Account Manager

Matti Saukko

FAQ about the service

 

Power distribution solutions for data centres are designed so that commissioning is predictable and capacity scales without interruptions.

How do you ensure the solution works right at commissioning?

We test the power distribution as a whole before delivery. This ensures that connections, functionality and documentation are ready and no extra changes are needed during commissioning.

How can capacity be increased without downtime?

The modular structure allows capacity to be added in stages without having to stop or rebuild the existing system.

What do eHOUSE and ePOD solutions mean in practice?

They are factory-built complete units in which the power distribution has been built and tested ready. On site they are installed and put into operation without extensive local construction.

What does the delivery include?

The delivery can include switchgear, distribution, modular solutions and connections. The scope is defined based on the project’s capacity and requirements.

How is availability of power distribution ensured in a data centre?

Power distribution is designed so that feed and distribution support continuous operation also in fault situations. The solution takes redundancy into account, so that a single failure does not interrupt the operation of the whole system.

How is the power feed and distribution built in a data centre?

The power feed and distribution are designed layer by layer, from main switchboards to distribution and further to the loads. This ensures a controlled whole where capacity, availability and expandability stay under control.

Why is testing before delivery critical in data centres?

Because there is no time to fix errors at commissioning. When the whole has been tested in advance, the system is ensured to work from the very first connection.

Why can’t changes be made during commissioning in data centres?

Because commissioning is directly linked to bringing capacity into use and launching services. Delays affect the business directly.

How can expansions be done without downtime?

The modular structure allows new parts to be added without having to stop the existing system.

What does it mean that the solution is delivered ready to use?

It means that the switchgear, distribution and connections have been built, tested and documented ready. On site, the solution is put into use, not built from scratch.