Power distribution solutions for vessels and marine sites. Designed to withstand the conditions, meet the requirements and work within limited space.

Ask a specialist
Leave a contact request

Power distribution that works at sea

In marine environments, more is demanded of power distribution than in ordinary sites. Space is limited, operating conditions place continuous strain on the systems, and the requirements are precisely defined.

We design and deliver the power distribution solutions for marine sites so that they are adapted to the space, the requirements and the operating conditions in advance. The solution must withstand vibration, moisture and temperature variation, as well as meet the requirements of classification societies and site-specific standards.

If these boundary conditions are not taken into account in time, problems usually surface only at installation, when changes are slow and expensive. Cooperation can be based on ready plans or it can start from a situation where the solution still has to be defined. We ensure that the solution fits the available space and can be installed without on-site modifications.

Explore all products

Designed for demanding environments

Designed to withstand the conditions thumbnail

Designed to withstand the conditions

Solutions are sized to withstand the vibration, moisture and temperature variation that occur continuously in the marine environment. This avoids situations where components wear out prematurely or the system starts to malfunction in use.

Meets requirements and standards thumbnail

Meets requirements and standards

Classification society requirements and site-specific standards are taken into account already in the design. This eases approvals and reduces the risk of the project being delayed by interpretation of requirements or change needs.

Fits the space without adjustment thumbnail

Fits the space without adjustment

The solution is designed to fit into limited space and to be installed without modification on site. This reduces surprises during installation and speeds up project progress.

How we ensure the requirements are met

In marine projects, the solution has to work correctly already before installation.

1

Needs assessment and requirements review

We go through the site’s requirements, the classification society conditions and the space constraints. This ensures that the boundary conditions of the solution are clear before design and that potential risk points are identified in time.

2

Design and fitting

We design the solution so that it meets the requirements and fits into the available space. The solution is fitted ready into the plan — it is not left to be modified during installation.

3

Execution and delivery

We manufacture and deliver the solution ready for commissioning. The end result is a whole that can be installed as planned, without on-site modifications.

How can we help?

Tell us about the site’s requirements and boundary conditions. We help design a power distribution solution that meets the requirements, fits the space, works and withstands heavy use.

Jari Räsänen thumbnail

Sales, Marine

Jari Räsänen

Lasse-Pekka Holopainen thumbnail

Key Account Manager

Lasse-Pekka Holopainen

Ville Malinen thumbnail

Business Manager

Ville Malinen

FAQ about the service

 

You get support from us throughout the project, from design to execution. Below you will find answers to questions that come up in marine projects.

How do you ensure that the solutions withstand the operating conditions?

The structures, components and enclosures are designed to match the site’s operating conditions. This way power distribution works reliably in continuous use without premature wear or faults.

How are classification society requirements taken into account?

Classification society requirements are taken into account already in the design phase and the solution is verified against them before delivery. This eases approvals and reduces change needs during the project.

How do you ensure that the solution fits the space?

The whole is sized and designed to match the site’s space constraints. This way the solution can be installed in the planned location without on-site modifications.

Can the solutions be modified during the project?

Yes. Changes can be made in a controlled way during the project, but the aim is to have the whole as ready as possible before manufacturing and installation.

Can you come on board even if the plans are not yet ready?

Yes. The power distribution whole can be defined from scratch or carried out on the basis of ready plans.

Why is the right-first-time principle emphasised in marine projects?

Because making changes at the installation stage or at sea is slow and expensive. That is why the solution has to work correctly before commissioning.

At what stage do errors usually arise?

Often at the interface between design, requirements and space fitting. If the whole is not precisely adapted to the space and the boundary conditions, problems only surface at installation.